Planned preventative maintenance
Scheduled maintenance contracts, so plant gets looked after before it fails rather than after.
What a contract covers
- An asset list of what you actually have, which is usually the first useful thing we produce
- A service schedule per asset, planned across the year
- Compliance records kept up to date and available when an auditor asks
- Priority response when something does fail
Reactive maintenance is the expensive kind
Unplanned failures happen at the worst time, cost more to fix, and take the building with them. Planned maintenance moves the work into a window you choose, and gives you the paperwork as a by-product rather than a scramble.
Start with a survey
Every job of this kind starts with someone looking at the building. Tell us what you have and we will arrange it.
Request a site surveyWhy choose Promec
Certified by the manufacturers
Not a claim we made up. The manufacturers themselves certify our technicians as trained on their equipment, brand by brand.
RGI registered, F-Gas certified
Gas work by Registered Gas Installers, refrigerant handled by F-Gas certified engineers. Directly employed, not subcontracted.
40+ years in the trade
Promec have been doing mechanical work since long before heat pumps were fashionable, on everything from houses to hospitals.
One price, agreed first
You know what the service costs before we come out, and parts are quoted before anything is fitted.






Also Nilan, Joule, Unitherm, Pipelife, Grant, Firebird, Warmflow, Worcester Bosch and Vaillant.
RGI-registered gas installers and F-Gas certified refrigerant handlers, directly employed rather than subcontracted.
Other services
Not sure what you need?
Answer a few questions and we will tell you which service fits, roughly what it costs, and get it straight to the right engineer. Takes about a minute.
